COMPARISON OF LAND REQUIREMENT FOR DIFF. SIZE OF PLANT

CONTINUED FROM 6.

LET US GO TO TABULAR FORM FOR UNDERSTANDING THE MATTER.

--------------------------------------------------------------------------------------------------------------------------
DESCRIPTION                                              FOR INDIAN COAL               FOR IMPORTED COAL
--------------------------------------------------------------------------------------------------------------------------
                                                                         AREA            %                          AREA           %
                                                                       ---------------------------------------------------------------------

1. MAIN PLANT PKG ( CHIMNEY TO
   TRANSFORMER YARD INCLUDING
    SG AND TG )                                                 92              3.321                            70            4.575


2. COAL STORAGE AND HANDLING          250              9.02                            200          13.07

3. WATER SYSTEM AND RESERVOIR         310             11.191                         154          10.06

4.  SWITCHYARD                                             106              3.826                          106           6.928

5.  MISC BALANCE OF PLANTS PKG,
     DM,ASH FOPH SYS,COMP, ETC, ROADS
     DRAINS, STORES ETC.                               139                 5                              110            7.189

6.  GREEN BELT                                                408              14.729                        273        17.843

7.  ASH DISPOSAL AREA                                1080              38.989                        327        21.372

8. TOWNSHIP                                                      150                 5.415                       150          9.803

9. MISC CORRIDOR TO BE USED FOR
    ASH ,WATER, TRANSPORT SYSTEM          235                 8.483                       140          9.15

                                                          TOTAL       2770                                                1530
------------------------------------------------------------------------------------------------------------------------

The above figure was arrived by a team of experts appointed as committee member to finalise land requirement of UMPP ( ultra Mega power plant ) having size of 5x 800 MW at India. To overcome
the power crisis in INDIA five to six numbers to be established on tariff based tendering.

To settle the land requirement expert committee views were taken for cost consideration and calculation.

Further options on land w


ill be discussed in next day blogg.


  