DESCRIPTION FOR INDIAN COAL FOR IMPORTED COAL
--------------------------------------------------------------------------------------------------------------------------
AREA % AREA %
---------------------------------------------------------------------
1. MAIN PLANT PKG ( CHIMNEY TO
TRANSFORMER YARD INCLUDING
SG AND TG ) 92 3.321 70 4.575
2. COAL STORAGE AND HANDLING 250 9.02 200 13.07
3. WATER SYSTEM AND RESERVOIR 310 11.191 154 10.06
4. SWITCHYARD 106 3.826 106 6.928
5. MISC BALANCE OF PLANTS PKG,
DM,ASH FOPH SYS,COMP, ETC, ROADS
DRAINS, STORES ETC. 139 5 110 7.189
6. GREEN BELT 408 14.729 273 17.843
7. ASH DISPOSAL AREA 1080 38.989 327 21.372
8. TOWNSHIP 150 5.415 150 9.803
9. MISC CORRIDOR TO BE USED FOR
ASH ,WATER, TRANSPORT SYSTEM 235 8.483 140 9.15
TOTAL 2770 1530
------------------------------------------------------------------------------------------------------------------------
The above figure was arrived by a team of experts appointed as committee member to finalise land requirement of UMPP ( ultra Mega power plant ) having size of 5x 800 MW at India. To overcome
the power crisis in INDIA five to six numbers to be established on tariff based tendering.
To settle the land requirement expert committee views were taken for cost consideration and calculation.
Further options on land w
ill be discussed in next day blogg.
LET US GO TO TABULAR FORM FOR UNDERSTANDING THE MATTER.
--------------------------------------------------------------------------------------------------------------------------
DESCRIPTION FOR INDIAN COAL FOR IMPORTED COAL
--------------------------------------------------------------------------------------------------------------------------
AREA % AREA %
---------------------------------------------------------------------
1. MAIN PLANT PKG ( CHIMNEY TO
TRANSFORMER YARD INCLUDING
SG AND TG ) 92 3.321 70 4.575
2. COAL STORAGE AND HANDLING 250 9.02 200 13.07
3. WATER SYSTEM AND RESERVOIR 310 11.191 154 10.06
4. SWITCHYARD 106 3.826 106 6.928
5. MISC BALANCE OF PLANTS PKG,
DM,ASH FOPH SYS,COMP, ETC, ROADS
DRAINS, STORES ETC. 139 5 110 7.189
6. GREEN BELT 408 14.729 273 17.843
7. ASH DISPOSAL AREA 1080 38.989 327 21.372
8. TOWNSHIP 150 5.415 150 9.803
9. MISC CORRIDOR TO BE USED FOR
ASH ,WATER, TRANSPORT SYSTEM 235 8.483 140 9.15
TOTAL 2770 1530
------------------------------------------------------------------------------------------------------------------------
The above figure was arrived by a team of experts appointed as committee member to finalise land requirement of UMPP ( ultra Mega power plant ) having size of 5x 800 MW at India. To overcome
the power crisis in INDIA five to six numbers to be established on tariff based tendering.
To settle the land requirement expert committee views were taken for cost consideration and calculation.
Further options on land w