INTRODUCTION 2.

serialno.2.

Serial no.1 describe the general idea about construction of Thermal Power Station and dilemma exists in this field .From now onwards we will be touching technical matters along with other aspect of thermal power station. As already explained we will discuss about only pulverised fuel plants in the beginning.
Let us assume  group named  "AABB LTD" wants to build a power station in India . We also assume that they have already tied up with financial company for fund we generally calls it financial closure of the project. It generally happens during project execution time due to various reasons. These matters  itself a specialised subject needs to be studied by finance executive with project management . However it is helpful if an idea in macro form is kept in mind like definition of financial terms etc. We need not to discuss further on this and leave the same for others.
While the group tied with Financial institution ( those who give loans to company) then they will look out for other aspect of building a thermal power plant.According to their strength they will look out for a suitable location.
Location depends on following technical criteria.
A. Power plant location should be near the pit head ( it means transportation cost of coal is minimum.
B. Source of water is nearby ( River , Dams etc)
C. Disposal of ASH to the mines where coal comes from and part of the same for other use.
D. Near state GRID or National GRID. 
      
The above conditions are ideal to build a thermal power plant but in reality may be one criteria can be achieved for which laid down procedures and norms are exiting..
serial no 2 completed.  (to be continued) 