Total Pageviews

Tuesday 26 March 2013

CONSTRUCTION QUALITY LIMITS FOR BOILER PRESSURE PART IN THERMALPOWER PLANT


1. Bow in headres -for membrane panels                                           1mm/M (min) / 8mm (Max)  

2. Bow in headers - for other   panels                                                 1mm/M ( min) /10 mm (Max)

3. Headers scarfing line -for membrane panels                                    2mm (Max)

4. Headers scarfing line -for other panels                                            4mm (Max)

5. Membrane Panel width                                                                 + 2mm to -5 mm

6. Diagonal difference of Panel (D1-D2)                                            10mm (Max)

7. Verticality of Downcomer lines                                                      1mm/M , 5 mm (Max)

8. Bow in seperator /collector tanks                                                    1mm/M, 10 mm (Max).

9. Headers -elevation and spacing                                                        + / -  3 mm.

10. Furnace alignment ( Front and back Pass) width & depth              + 10 mm or -15mm

11. --------------- Do------------------------ Diagonal difference                20 mm (Max)

12. Fire ball angle -Permissible limit                                                    + /-  1 degree

13. Pitch of  water wall screen tubes & Back Pass front wall tubes      + /- 3mm

14. Pitch of Screen Tubes                                                                      +/- 10mm

15.  LTRH Coil and Pitch between centre line of side wall end to coil assembly  + /- 10mm

16. LTRH- Pitch coils                                                                            + /- 10 mm.

17. LTRH Coil and Pitch between centre line of front /rear wall to coils end +/- 20 mm.

18. Spacing between RH hanger  tubes                                                  + /- 3mm.

19. Platen  Super heaters coil and pitch between centre line of side
      water wall and end coil assembly.                                                    + / - 25 mm.

20. Platen Super heaters - Pitch of coils                                                 + /- 25 mm.

21.  Final Super heaters -  coil and pitch between centre line of side
      water wall and end coil assembly.                                                     +/- 10 mm.

22. Final Super Heaters - Pitch of coils                                                  + /- 10 mm.

23. Economiser- coil and pitch between centre line of side
      backpass  wall and end coil assembly.                                               +/- 10 mm.

24. Economiser- pitch of coils                                                                 +/- 10 mm.

25. Economiser -clearance between centre line of back pass front/
      rear wall and coil ends.                                                                       +/- 20 mm.

26. Re -heaters - coil and pitch between centre line of side water wall
      and coil assembly.                                                                               +/- 10 mm.

27. Re-heaters - Pitch of coils                                                                   + / - 10 mm.


In sub critical boiler where drum erection is involved instead of seperator an collector

following field quality checks are made.

1. Drum suspension U rod twist between limbs                                           10 mm max.

2. Disposition of Drum axis centre line of ceiling Girder                             1mm/M max +/- 5 mm

3. Spacing of washer plate w.r.t. longitudinal axis and drum axis                 1mm/M max +/- 3mm

4.Diagonal difference between washer plate locations                                   max 5 mm.

5.Elevation of Drum                                                                                       +/- 5mm

6. Elevation of drum -cummulative                                                                 max 8mm

7. Spacing of Drum axis w.r.t to centre line of ceiling girders.                      1mm/M max +/- 5 mm

8. Axial shifting of drum w.r.t longitudinal axis                                            5 mm max

9. Verticality of drum suspension U rod                                                        10 mm max.

Beisdes above checks for pressure parts there are certain checks to be carried out and

recorded like above. It is to be noted that all Pressure parts item vessels , pipes and tubes

etc .are coming under the perview of Boiler directorate and their acceptance is must and

binding to all. Therefore all the records are to be maintained accordingly.


- Inspection authority's stamp to be checked in every material and if possible take the copy

  of the stamp . Also match with the paper certificate.

- All the pressure part items like vessel , pipes , coils ,panels etc are to be cleaned from outside

  and inside. Sponge ball test to be carried with compressed specially for coils , panels etc .

- For major items like drum , vessel etc level marking to be done accurately for future reference.

  For sub critical Boiler all the reference of headers start from drum positioning.

- Alignment of headers , coils ,panels are to recorded.



 Platen super heater coils and Final super heater coils are visible through water wall panel

P.S If  you are looking to earn few legitimate extra money from the comfort of your home then please click on the link given below

LINK 1 - PLEASE CLICK HERE 
LINK 2 - PLEASE CLICK HERE

1 comment:

  1. I would like to know the effect of deviations in coil (super heaters,reheaters economisers etc) alignments, spacings in THERMAL POWER PLANT BOILERS

    ReplyDelete