  SOME OF THE ERECTION TOLERANCE FOR STRUCTURAL WORK IN A POWER HOUSE                   (TYPICAL)

-Foundation for columns ( Top elevation)                                                  - 20 mm / + 10 mm.

-Dimension between two adjacent foundations for columns                 1mm/metre max. up to + 5 mm

-Adjacent pedestal diagonal difference                                                 1mm/metre max. up to + 15 mm

- Foundation Bolt pitch difference                                                          + 3 mm

- Foundation bolt diagonal difference                                                    + / - 5 mm

- Grouting Gap for secondary Grout                                                        + 25 to + 70 mm (max)

- Individual Column sweep and Camber                                    1mm/metre max. up to + 10 mm

-Total length after pre-assembly                                                    + / - 15 mm

- Sweep and camber for total length                                               max 15 mm.

- Out of vertical                                                                      1mm/metre max. up to 25 M

- Elevation Tolerance at reference level                                           + 5 mm

- Level difference of supporting joints                                              5 mm

- Deviation difference between purlins                                              5 mm

- Crane Girder centre to center spacing                                              5 mm

- Crane girder top level                                                                      5 mm

- platform level difference                                                                  5 mm

- HSFG bolt tightening                                           ( as per size of the bolt with torque wrench )

- when truss span <  25  metre                                                            + /- 7 mm

- truu span is > 25 metre                                                                     + / - 10 mm

- Beam span is < 25 metre                                                                    + / - 10 mm

-Beam span is > 25 metre                                                                      + /- 15 mm

SOME OF THE FABRICATION TOLERANCES

Name of Deviation                             column          Beams           Crane girder

Base plate and column                          0.1 mm


Frame Joints                                         2.0 mm

Web and flange                                    1.5 mm         1.5 mm               0.1 mm

Web & stiffeners                                   1.5 mm        1.5 mm               0.1 mm

Flange & stiffeners Intermediate
 stiffeners & Bearing stiffeners:              1.5 mm       1.5 mm               0.1 mm

Cap plate & column                               0.1 mm

Crane girder seat                                   0.1 mm

Beam brackets                                      2.0 mm     


          PORTABLE HOLDING OVENS FOR WELDER 'S USE  AT WORK SITE.


  
 
           A TYPICAL SKETCH OF COLUMN FOUNDATION SHOWING MEASUREMENT PTS.