Total Pageviews

Saturday 5 November 2016

PRE CHARGING TEST AND COMMISSIONING OF HT SWITCH GEAR (TYPICAL) ( photoes) -ABC OF THERMAL POWER STATION


HT switchgear getting erected in the power plant.




A portion of single line diagram of HT line at thermal power station.





No comments:

Post a Comment