Earth pit checking
Each earth pit is checked as mentioned in the standard check
list of
Switch yard earthing system
Check that the depth of the earth pit is 3.5 Mtr in case of
pipe
electrode 3 Mtr incase of rod electrode.
Incase of pipe electrode, earth pit must be having the
layers of sand, gravel, salt, and coal with the thickness as mentioned in the separate detail.
Thickness of the gravel must be 150mm and the gravel must be spread over the
switch yard area.
Main earthing and subsidiary conductors are to be ensured
that 40/50 mm dia rod is used for the
same.
GENERAL CHECKS :
Minimum spacing
between electrodes shall be 6 Mtrs.
Earthing conductor
shall be laid at least 300 mm below cable trenches and under ground service
ducts, pipes, tunnels, railway tracks etc., if crossed.
Risers of 40/50 mm
dia MS rod shall be brought nearby equipment foundations : 1. 2
Nos. for each equipment earthing.
2. 1 No. for each structural earthing.
Risers end near the foundation shall be brought 300 mm above
the ground level near foundation.
Earthing conductors along their run on cable trench ladder
columns, beams, walls, etc. shall be supported by suitable welding/cleat fixation at
intervals of 750mm .
Galvanized iron sleeves shall be provided for the passage of
the conductors where ever it passes through the walls. Both ends of the sleeves
shall be sealed to prevent the passage of water through the sleeve.
Earthing conductor
embedded in concrete shall have approximately 50 mm concrete cover.
Auxiliary mesh of 1500 x 1500 mm size shall be laid at
spacing of 300 mm below operating boxes of circuit breakers, isolators-main
switches and earth switches.
All joints shall be
welded as per the drawing and IS code.
LAs, CVTs, and Earth wire down conductor shall be connected
to the main earth mat through rod electrodes, rod electrodes shall be made out
of 40 dia MS rods at site.
Lightning Masts down conductor shall be connected to earth
mat through 1 NO. pipe electrode.
Transformer neutral shall be connected to earth mat through
2 nos. pipe electrodes.
Earth mat shall extend 2 mtrs outside the switch yard fence
through rod electrode.
All equipment shall be earthed to at least two points on
opposite side which shall be connected to different conductors of the earth mat.
Testing of earth pits :
Earth pit resistance is measured with earth megger and it should be in
the range of 1 to 1.5 ohms. The continuity between two earth pits connected
together is checked using a multimeter and it should show exact continuity.
Earth resistance of earth mat is measured and it should be
in the range of 0 to 0.05 ohms.
Check overlapping of joints are welded with no gap between
two joints.
The connection of earthing network is checked according to
the layout drawing.
We will discuss 220V DC System as this system is required to start AC system
breaker. Therefore a little knowledge on
DC system will help to understand the electrical system.
You shared an amazing information. So informative! Thanks for sharing!
ReplyDeleteDo you want to check high quality Steam turbines? Click here now>>