Till last blog I have tried to explain basics of thermal power stations including enviormental
requirement , land requirement , soil testing , other aspect of information required initially for
civil design , discussed about civil works requirement ,fabrication and erection of structural
items , Boiler and its auxiliaries erection, ESP erection and a brief on commissioning of ESP.
In 107 blogs above aspects were covered . I am writing the blog for new comers to construction
field so that they will have an idea about a power station. I received number of mails on my
mails from different sources i.e students , newly appointed construction people etc and I tried
my best to answer their questions . I learn a lot from their questions and I do hope all the readers
will participate in question and answer on the topics.
Today I will start to discuss about critical piping and LP piping of a thermal power station.
Piping involves lot of welding ,NDE , pre heating ,post heating ,stress relieving etc and its
a vast subject to cover. However my endeavour will be to give basic knowledge required for
piping erection.
-Critical Piping scope covers following work in general-
-Complete auxiliary PRDS & Aux. Steam piping system up to Terminal Point.
CONTINUED
P.S If you are looking to earn few legitimate extra money from the comfort of your home then please click on the link given below
LINK 1 - PLEASE CLICK HERE
LINK 2 - PLEASE CLICK HERE
requirement , land requirement , soil testing , other aspect of information required initially for
civil design , discussed about civil works requirement ,fabrication and erection of structural
items , Boiler and its auxiliaries erection, ESP erection and a brief on commissioning of ESP.
In 107 blogs above aspects were covered . I am writing the blog for new comers to construction
field so that they will have an idea about a power station. I received number of mails on my
mails from different sources i.e students , newly appointed construction people etc and I tried
my best to answer their questions . I learn a lot from their questions and I do hope all the readers
will participate in question and answer on the topics.
Today I will start to discuss about critical piping and LP piping of a thermal power station.
Piping involves lot of welding ,NDE , pre heating ,post heating ,stress relieving etc and its
a vast subject to cover. However my endeavour will be to give basic knowledge required for
piping erection.
-Critical Piping scope covers following work in general-
-Complete main
steam, hot reheat & cold reheat piping between boiler and turbine nozzles,
HP bypass upstream & downstream piping and LP bypass upstream & downstream piping up
to the condenser inlet
nozzles- as per P&ID finalised during the detailed engineering.
-Complete auxiliary PRDS & Aux. Steam piping system up to Terminal Point.
-Interconnection of Auxiliary steam
piping with existing stage (s) as per scope indicated in
tender
drawing, along with necessary trestles.
-Spray
piping system for the following , :
(1.) Re heater attemperation,
(2.) Super heater attemperation
(3.) Auxiliary
PRDS system
-Steam
drains from piping /equipment(s) such as. flash Tank(s) /
flash tank
manifold(s) as per the scope .
- Miscellaneous
line drains and vents.
- Complete
safety valve exhaust piping for SVs / SRVs on piping/equipment .
The
Scope of Low Pressure (LP) piping shall cover piping systems for the following
services.
(a.) Boiler fill system.
(b.) Equipment Cooling Water (ECW) system including its chemical dosing
system (both
primary
and secondary)
(c.) Service
water cum CW blow down system
(d.) Instrument Air System.
(e.) Service (plant) Air System.
(f.) Drain piping system for the piping\equipment etc.
(g.) Tanks as described elsewhere in the specification
for the above systems.
(h) Air preheater wash water system
(i) Re-circulation pipes along with valves, breakdown
orificies etc.,
CONTINUED
P.S If you are looking to earn few legitimate extra money from the comfort of your home then please click on the link given below
LINK 1 - PLEASE CLICK HERE
LINK 2 - PLEASE CLICK HERE
I'm joining as a engineer in critical piping things i have to know before getting into site.
ReplyDeletefantastic
ReplyDeleteBut how can i download these materials ?
How much thickness of CRH
ReplyDeleteKeep in mind that it may be a serious mistake to consider sizing your Compressed Air Piping Systems solely for current flow requirements, rather than planning for future additions.
ReplyDelete