Total Pageviews

Thursday, 4 April 2013

COMMON KNOWLEDGE OF PRESSURE PART WELDING FOR BOILER IN THERMAL POWER PLANT

There are few basic information required to carry out the erection / construction of

pressure parts of boiler. These items are described briefly below for ready reference.


The welding of all pressure parts and high pressure piping shall be in accordance

 with the following requirements:

Qualification of Weld Procedures



All the welding procedures adopted  shall be qualified in accordance with the latest

applicable requirements of Section IX of ASME code before the work is begun.

Certified welding procedures for welding of pressure parts and piping's  should

contain the type of material, material thickness, the joint details, the pre-heat

temperature maintained, the post weld heat treatment given and the welding current

and the voltage used during qualifications of welding procedures.

Welder's Qualification                 


Only welders, qualified in accordance with the latest applicable requirements of

the Indian Boiler Regulations, shall be permitted to perform any welding work

on the pressure parts. In addition to such statutory qualification requirements,

the welders shall also perform a satisfactory pre-production qualification test to

be conducted at site in consultation with site welding engineer . The services of

an independent testing laboratory can be retained  to perform welder qualification

tests for welders.

All the welders carrying out welding at site, shall carry an identification badge,

which shall indicate the category and the grade of welding for which they have

been tested and authorised to carry out welding. All such badges shall be presented

on demand to the inspection authority.


All records of the welding procedures, the welder's qualification tests and

the welders' performance details for the work performed shall be maintained .

The names of all the welders who made each weld on the boiler pressure parts and

piping within the jurisdiction of the Indian Boiler Regulations shall be maintained .

The certified copies of any or all the above documents shall be submitted to

authority on demand. Marking of welded joints to be done as per norms.

HEAT TREATMENT


Pre-heating, post-heating and post - weld stress relief operations of all welds, shall be

performed in accordance with the requirements of applicable code. Local post weld

stress relieving heat - treatments shall be adopted only in cases where it is normally

impracticable to subject the entire assembly as such for stress relieving operations.

Heating may be by means of electric induction coils or electric resistance coils.

Oxyacetylene flame heating or exothermic chemical heating methods will not be

permitted. Complete recording of the temperatures through out the stress relieving

cycle of the material and the weld subjected to heat treatment shall be made by means

of a potentiometric recorder. Recorders other than those of potentiometric type shall

not be used for such temperature recording during stress relieving operations.


After setting up the weld joint for heat treatment operation, signatures shall be obtained

on the strips chart of the recorder prior to starting of heat treatment cycle. The right

hand corner of the strip chart at the starting point of the heat treatment cycle shall

contain details like the weld number, material, diameter and thickness, method of

heating adopted, prescribed ranges of heat treatment temperatures, date of heat treatment,

reference to item number of the Field welding Schedule.


FIELD WELDING SCHEDULE

Field welding schedule should contain following information:


a) Drawing No (s)

b) Location of the weld

c) Size of the weld (outside diameter and thickness)

d) Type of joints

e) Material specifications

f) Size of fillet on backing ring, when the type of joint is with backing ring

g) Electrode/ filler metal specifications

h) Number of welds per unit

i) Quantity of filler metal per weld

j) Indication of required Non-destructive Examination (NDE) for each weld

k) Pre-heat temperatures for welding

l) Process of welding

m) Post-welding heat treatment temperature ranges, duration, entitled 'Qualification of Weld Procedures' .

Continued to part-III

P.S If  you are looking to earn few legitimate extra money from the comfort of your home then please click on the link given below

LINK 1 - PLEASE CLICK HERE 
LINK 2 - PLEASE CLICK HERE







2 comments:

  1. Nice Post. So informative. Keep sharing!

    If you're in need of Turbine services, products, maintenance and installation, call Ncon turbines.

    ReplyDelete