THIS BLOG IS WRITTEN FOR CONSTRUCTION SUPERVISORS AND ENGINEERS TO GAIN PRACTICAL KNOWLEDGE ON THERMAL POWER STATION BOTH ON SUB CRITICAL AND SUPER CRITICAL TECHNOLOGY.
Total Pageviews
Saturday, 5 November 2016
PRE CHARGING TEST AND COMMISSIONING OF HT SWITCH GEAR (TYPICAL) ( photoes) -ABC OF THERMAL POWER STATION
HT switchgear getting erected in the power plant.
A portion of single line diagram of HT line at thermal power station.