ERECTION OF TURBINE GENERATOR PKG PART-IV, PEDESTAL, BASE PLATE ERECTION - ABC OF THERMAL POWER PLANT.

›
Part –IV Once all the physical checks are over and shuttering has been removed then we can proceed for Ultrasonic Testing of foundatio...
1 comment:
Sunday, 23 March 2014

ERECTION OF TURBINE GENERATOR PKG PART-III, CHECKING OF TG FDNS PRE AND POST CASTING - ABC OF THERMAL POWER PLANT.

›
PART_III Supervision during casting under progress for TG foundation Check that there is   no disturbance to the insert etc. during...
2 comments:
Thursday, 20 March 2014

ERECTION AND COMMISSIONING OF TURBINE GENERATOR PKG PART-II ABC OF THERMAL POWER PLANT.

›
part-2 Turbine Turbine foundation will be done by Main civil vendor. In earlier days turbine foundation was casted as a singl...
1 comment:
Tuesday, 18 March 2014

ERECTION AND COMMISSIONING OF TURBINE GENERATOR PKG PART-I ABC OF THERMAL POWER PLANT.

›
Turbine Generator Package of Thermal Power Plant Turbine Generator Package consist of following packages and systems.  Turbine  ( HP...
1 comment:
Thursday, 13 March 2014

BALANCE WORK OF BOILER PART -II SOOT BLOWER , CC PUMP -ABC OF THERMAL POWER PLANT

›
                                                    Installation procedure of BWCP or CC PUMP. Generally this pump is getting erected ...
Saturday, 8 March 2014

BALANCE WORK OF BOILER PART -I SSOT BLOWER , CC PUMP -ABC OF THERMAL POWER PLANT

›
Till date I have covered important aspects of Boiler erection and commissioning item wise . However there are few other items also which ...
2 comments:
Saturday, 1 March 2014

COMMISSIONING BOILER ALKALI BOIL OUT ,ACID /EDTA CLEANING PART -VII CONCLUDING PART-ABC OF THERMAL POWER PLANT

›
In this dispatch I will give advantages of EDTA cleaning over conventional acid cleaning and a few pictures.  ...
4 comments:
‹
›
Home
View web version

About Me

Debasish Guha
I HAVE THIRTY FIVE YEARS OF EXPERIENCE ON BUILDING POWER STATIONS AT DIFFERENT PARTS OF INDIA. DURING ERECTION AND COMMISSIONING OF POWER STATION IT WAS FELT THAT CONSTRUCTION SUPERVISORS AND ENGINEERS KNOWLEDGE ABOUT A POWER STATION IS VERY LIMITED TO HIS OWN FIELD. CONSTRUCTION FIELD IS UNORGANISED IN INDIA. IT FELT PRUDENT TO GIVE THEM KNOWLEDGE OF ENTIRE POWERSTATION IN BRIEF SO THAT THEY CAN UNDERSTAND THE LINK OF THEIR WORK TO SYSTEM. ALSO NEW ENTRANTS WILL BE EQUIPPED WITH GOOD TECHNICAL KNOWLEDGE.
View my complete profile
Powered by Blogger.