ABC OF THERMAL POWER PLANT

THIS BLOG IS WRITTEN FOR CONSTRUCTION SUPERVISORS AND ENGINEERS TO GAIN PRACTICAL KNOWLEDGE ON THERMAL POWER STATION BOTH ON SUB CRITICAL AND SUPER CRITICAL TECHNOLOGY.

Friday, 15 December 2017

CONTROL AND INSTRUMENTATION OF THERMAL POWER STATION - PART -II

›
Since last post considerable time was lapsed I could not deliver any post due to illness. I hope i will resume to share my experience of p...
16 comments:
Thursday, 9 November 2017

TRAGIC INCIDENCE AT UNCHAHAR THERMAL POWER STATION. LIKELY CAUSE

›
Shocking news of Boiler explosion at Unchahar power station was very painful to all power engineers who are actively associated with Powe...
7 comments:
Thursday, 10 August 2017

CONTROL AND INSTRUMENTATION OF THERMAL POWER STATION - PART -I

›
Till date we have discussed all the aspects of  thermal power station starting from civil construction , equipment erection and commissio...
8 comments:
Sunday, 12 March 2017

CONCLUDING PART STEAM BLOWING PART -IV ABC OF THERMAL POWER PLANT

›
PART -IV COMPLETION CRITERIA Stages 1a, 2a, 1c, 3a, 3b, 4a,4b For the first few blows Target plates need not be kept. Afterwar...
2 comments:
Tuesday, 17 January 2017

STEAM BLOWING STAGES PART-III (BOILER COMMISSIONING) ABC OF THERMAL POWER PLANT

›
STEAM BLOWING  PART -III Stage 3a -- Steam inlet line from COLD RE HEAT to TURBINE DRIVEN BOILER FEED PUMP  A ESV. Steam valve of PRDS...
2 comments:
Sunday, 8 January 2017

STEAM BLOWING STAGES PART-II (BOILER COMMISSIONING) ABC OF THERMAL POWER PLANT

›
STEAM BLOWING -II Stage 1b --  Super heater, Main Steam Lines up to ESVs, temporary lines from ESVs to EOTVs, temporary loop from EOTV...
5 comments:
Friday, 6 January 2017

STEAM BLOWING PART -/I ABC OF THERMAL POWER PLANT

›
Steam blowing of MS lines, CRH,HRH,SH,RH,HP & LP bypass pipe lines of turbine is carried out in order to remove welding slag, loose ...
14 comments:
›
Home
View web version

About Me

Debasish Guha
I HAVE THIRTY FIVE YEARS OF EXPERIENCE ON BUILDING POWER STATIONS AT DIFFERENT PARTS OF INDIA. DURING ERECTION AND COMMISSIONING OF POWER STATION IT WAS FELT THAT CONSTRUCTION SUPERVISORS AND ENGINEERS KNOWLEDGE ABOUT A POWER STATION IS VERY LIMITED TO HIS OWN FIELD. CONSTRUCTION FIELD IS UNORGANISED IN INDIA. IT FELT PRUDENT TO GIVE THEM KNOWLEDGE OF ENTIRE POWERSTATION IN BRIEF SO THAT THEY CAN UNDERSTAND THE LINK OF THEIR WORK TO SYSTEM. ALSO NEW ENTRANTS WILL BE EQUIPPED WITH GOOD TECHNICAL KNOWLEDGE.
View my complete profile
Powered by Blogger.