ABC OF THERMAL POWER PLANT

THIS BLOG IS WRITTEN FOR CONSTRUCTION SUPERVISORS AND ENGINEERS TO GAIN PRACTICAL KNOWLEDGE ON THERMAL POWER STATION BOTH ON SUB CRITICAL AND SUPER CRITICAL TECHNOLOGY.

Monday, 13 January 2014

LDO ,FO UNLOADING AND PRESURING SYSTEM FOR A STEAM GENERATOR -ABC OF THERMAL POWER PLANT -PART-I

›
The fuel oil plant consists of a.      Fuel (LFO/LDO & HFO) unloading terminal b.      Fuel (LFO/ LDO & HFO) unloading pump...
1 comment:
Monday, 16 December 2013

ID ,FD ,PA FAN COMMISSIONING OF BOILER PART -X ABC OF THERMAL POWER STATION

›
Pre-commissioning Check List/activity to be carried out Check the erection protocol /log sheet for foundation bolt tightness , clea...
10 comments:
Friday, 13 December 2013

ID,FD,PA FANS COMMISSIONING OF BOILER PART -X -ABC OFTHERMAL POWER

›
In my last blog I have discussed about the lube oil supply unit for fans ,Air heaters and Mills. Construction features and item inclu...
1 comment:
‹
›
Home
View web version

About Me

Debasish Guha
I HAVE THIRTY FIVE YEARS OF EXPERIENCE ON BUILDING POWER STATIONS AT DIFFERENT PARTS OF INDIA. DURING ERECTION AND COMMISSIONING OF POWER STATION IT WAS FELT THAT CONSTRUCTION SUPERVISORS AND ENGINEERS KNOWLEDGE ABOUT A POWER STATION IS VERY LIMITED TO HIS OWN FIELD. CONSTRUCTION FIELD IS UNORGANISED IN INDIA. IT FELT PRUDENT TO GIVE THEM KNOWLEDGE OF ENTIRE POWERSTATION IN BRIEF SO THAT THEY CAN UNDERSTAND THE LINK OF THEIR WORK TO SYSTEM. ALSO NEW ENTRANTS WILL BE EQUIPPED WITH GOOD TECHNICAL KNOWLEDGE.
View my complete profile
Powered by Blogger.