A list of materials and activities is given below for ready reference .All
this materials and activities need to be completed for declaring ESP ready
for use.
-Base Column and associated bracing (Horizontal & diagonal ) erection and
this materials and activities need to be completed for declaring ESP ready
for use.
-Base Column and associated bracing (Horizontal & diagonal ) erection and
alignment .
- Bearings ( there are few types of bearing) to be mounted on the top of
column.
- Intermediate frame erection
- Wall plate erection ( starting from bottom and centre from sides)
- Longitudinal beam and transverse beam erection.
- Erection of housing plate.
- Field erection.
- Insulator erection
*** For erection of longitudinal beam and transverse beam care should be
taken during welding and alignment as these are main load bearing member
which holds the weight of field with ash. Instances are there it fails during
full loading due to defects.****
- Insulator loading
- Removal of J bolt
- Field alignment
- Collecting electrode loading in the field.
- Shock bar angle erection
- Huck bolting
- Collecting electrode gauging.
- Inner roof erection.
- Hoppers wall Fit up.
- Bottom hopper erection.
- Hopper approach Platform.
- Ash level indicator platform.
- Hopper and wall plate door erection.
- Outlet screen sheet erection.
- Outlet funnel erection
- GD screen sheet erection
- Inlet funnel erection as per front availability.
- Pent House erection.
- Roof structure erection and sheeting with monorail beam erection
- Rain water Drains erection.
- Hoist erection on mono rail.
- Insulation on inner roof after air tightness test.
- Outer roof erection.
-Transformer erection.
- Oil Pan erection
- Disconnecting switch erection.
- Insulator Cover plate.
- Collecting mechanism with motor.
- Emitting mechanism and motor.
- GD screen sheet and motor.
- Deflection Plate and Ridge cap.
- Collecting and emitting Hammers.
- Inlet , outlet , left side and right side platform erection.
- Emitting electrode erection.
- Air tightness test and measure the value.
- Heater erection insulators ,Hopper heaters etc.
- Insulation wall plates , funnels inlet & outlet , Hopper plate etc.
- Erection of mechanical interlocks for transformers , insulator housing , wall
manual doors , hopper manual doors etc.
- Commissioning of rapping motors ,transformers ,hoist ,heaters etc.
- Field Charging.
CONTINUED TO CONCLUDING PART.
P.S If you are looking to earn few legitimate extra money from the comfort of your home then please click on the link given below
LINK 1 - PLEASE CLICK HERE
LINK 2 - PLEASE CLICK HERE
LINK 1 - PLEASE CLICK HERE
LINK 2 - PLEASE CLICK HERE
Can u pls put the description of pictures.. Eagerly waiting for your next post...
ReplyDelete