Above picture shows the position of ceiling girders on boiler Top with welded beam connected position.
Picture showing ceiling girders getting assembled at ground floor for welding. Supporting of ceiling
girders is needed to avoid distortion during welding.
Ceiling Girders 02 nos are placed inside the cavity
after taking support from Boiler columns . Two nos
each are positioned both sides and two numbers are
near front cavity. Postioning of ceiling Girder should
made carefully otherwise crane and material move
-ment will be big problem. If this is not followed
carefully then we may have to do fabrication of
ceiling Girder outside cavity.
Ceiling Girder fabrication
under progress. The details
C.G will be given in next
slide
contd to page VI
Picture showing ceiling girders getting assembled at ground floor for welding. Supporting of ceiling
girders is needed to avoid distortion during welding.
Ceiling Girders 02 nos are placed inside the cavity
after taking support from Boiler columns . Two nos
each are positioned both sides and two numbers are
near front cavity. Postioning of ceiling Girder should
made carefully otherwise crane and material move
-ment will be big problem. If this is not followed
carefully then we may have to do fabrication of
ceiling Girder outside cavity.
Ceiling Girder fabrication
under progress. The details
C.G will be given in next
slide
contd to page VI