Thursday, 25 September 2014

TURBINE AUXILIARIES (OIL SYSTEM -LUBE ) PART-II ABC OF THERMAL POWER PLANT

›
PART-II OIL SUPPLY DATA FOR A TYPICAL 500MW SET MANUFACTURED BY  BHEL MAIN OIL TANK, RATED CAPACITY:                       25/...
14 comments:
Friday, 19 September 2014

TURBINE AUXILIARIES (OIL SYSTEM -LUBE ) PART-I ABC OF THERMAL POWER PLANT

›
In continution of my last dispatch regarding Generator Gas system two photographs of the system is attached. TURBINE  LUBRICATION OI...
Friday, 12 September 2014

GENERATOR AUXILIARIES (GAS SYSTEM ) PART-III ABC OF THERMAL POWER PLANT

›
GAS SYSTEM: Generator is cooled by introducing H2 gas as coolant. Heated H2 gas is cooled on Hydrogen cooler attached with generator. Prim...
2 comments:
Monday, 8 September 2014

GENERATOR AUXILIARIES (PRIMARY WATER SYSTEM ) PART-II ABC OF THERMAL POWER PLANT

›
We are breifly discussing the important auxiliary system of Generator . In part-i we discussed about the seal oil system of generator. No...
12 comments:
Wednesday, 13 August 2014

GENERATOR AUXILIARIES (SEAL OIL SYSTEM ) PART-I ABC OF THERMAL POWER PLANT

›
Till  last dispatch I have outlined the installation of turbine and generator of thermal power plant briefly with the help of photos. I ha...
8 comments:
Wednesday, 30 July 2014

ERECTION SEQUENCE AND PLAN FOR GENERATOR PART-III ( ROTOR INSERTION) CONCLUDING PART. ABC OF THERMAL POWER PLANT.

›
  ROTOR INSERTION PROCESS STARTED. PLEASE NOTE THE ARRANGEMENTS MADE ON THE ROTOR FOR FIXING LIFTING CEILING FROM EOT CRANE . ...
Wednesday, 23 July 2014

ERECTION SEQUENCE AND PLAN FOR GENERATOR PART-II ABC OF THERMAL POWER PLANT.

›
Some of the checks are to be carried out before rotor threading is  given below All electrical tests (dc resistance, IR value and impedan...
‹
›
Home
View web version

About Me

Debasish Guha
I HAVE THIRTY FIVE YEARS OF EXPERIENCE ON BUILDING POWER STATIONS AT DIFFERENT PARTS OF INDIA. DURING ERECTION AND COMMISSIONING OF POWER STATION IT WAS FELT THAT CONSTRUCTION SUPERVISORS AND ENGINEERS KNOWLEDGE ABOUT A POWER STATION IS VERY LIMITED TO HIS OWN FIELD. CONSTRUCTION FIELD IS UNORGANISED IN INDIA. IT FELT PRUDENT TO GIVE THEM KNOWLEDGE OF ENTIRE POWERSTATION IN BRIEF SO THAT THEY CAN UNDERSTAND THE LINK OF THEIR WORK TO SYSTEM. ALSO NEW ENTRANTS WILL BE EQUIPPED WITH GOOD TECHNICAL KNOWLEDGE.