ABC OF THERMAL POWER PLANT

THIS BLOG IS WRITTEN FOR CONSTRUCTION SUPERVISORS AND ENGINEERS TO GAIN PRACTICAL KNOWLEDGE ON THERMAL POWER STATION BOTH ON SUB CRITICAL AND SUPER CRITICAL TECHNOLOGY.

Friday, 13 June 2014

GENERATOR PKG ERECTION PART-II, LIFTING ARRANGEMENTS OF GENERATOR - ABC OF THERMAL POWER PLANT.

›
PART- II Stator lifting by EOT Cranes:- In earlier days up to 210 /250 MW class the stator is being lifted by two EOT cranes of sim...
2 comments:
Sunday, 8 June 2014

GENERATOR PKG ERECTION PART-I, GENERAL FEATURES OF GENERATOR WITH PHOTOES - ABC OF THERMAL POWER PLANT.

›
PART -I Generator with exciter is the ultimate   output of all the system put together. This is very important item to be installed wi...
2 comments:
Tuesday, 27 May 2014

TURBINE GENERATOR PKG ERECTION PART-XII, SPRING ERECTION AND RELEASE - ABC OF THERMAL POWER PLANT.

›
Earlier days up to 250 MW most of the foundation was rigid and casted along with the main column foundation. But now a days all the TG d...
1 comment:
Saturday, 17 May 2014

TURBINE GENERATOR PKG ERECTION PART-XI, ERECTION SEQUENCE ,TIPS ETC.- ABC OF THERMAL POWER PLANT.

›
Part –XI Sealing and anti seizing compound used in turbine as per BHEL ‘ s Turbine manual. ==========================================...
1 comment:
‹
›
Home
View web version

About Me

Debasish Guha
I HAVE THIRTY FIVE YEARS OF EXPERIENCE ON BUILDING POWER STATIONS AT DIFFERENT PARTS OF INDIA. DURING ERECTION AND COMMISSIONING OF POWER STATION IT WAS FELT THAT CONSTRUCTION SUPERVISORS AND ENGINEERS KNOWLEDGE ABOUT A POWER STATION IS VERY LIMITED TO HIS OWN FIELD. CONSTRUCTION FIELD IS UNORGANISED IN INDIA. IT FELT PRUDENT TO GIVE THEM KNOWLEDGE OF ENTIRE POWERSTATION IN BRIEF SO THAT THEY CAN UNDERSTAND THE LINK OF THEIR WORK TO SYSTEM. ALSO NEW ENTRANTS WILL BE EQUIPPED WITH GOOD TECHNICAL KNOWLEDGE.