ABC OF THERMAL POWER PLANT

THIS BLOG IS WRITTEN FOR CONSTRUCTION SUPERVISORS AND ENGINEERS TO GAIN PRACTICAL KNOWLEDGE ON THERMAL POWER STATION BOTH ON SUB CRITICAL AND SUPER CRITICAL TECHNOLOGY.

Saturday, 30 November 2013

SEAL AIR FAN COMMISSIONING - BOILER COMMNG PART-VIII -ABC OF THERMAL POWER STATION.

›
Seal air fans are located  at zero metre level between first pass and second pass. These are high speed fans and prone to high vibration ...
5 comments:
Monday, 25 November 2013

COMMISSIONING OF SCANNER FAN -BOILER -ABC OF THERMAL POWER STATION

›
The scanner fan consists of following equipment and system Suction Filters 2 Nos. fans with motor. (AC and DC Scanner f...
1 comment:
Thursday, 21 November 2013

SOIL INVESTIGATION REPORT REQUIREMENT FOR DESIGNING.

›
Up to last blog about soil   investigation  we have seen the places in the thermal station needs soil  investigation and also type of fiel...
4 comments:
Tuesday, 19 November 2013

BOILER COMMISSIONING - MISC TANKS SMALL ,LARGE OF THERMAL POWER PLANT

›
There are different sizes of tanks are available in boiler ( Fuel oil storage tank , LDO tank , day tank CBD tank , IBD tank , CC ...
3 comments:
‹
›
Home
View web version

About Me

Debasish Guha
I HAVE THIRTY FIVE YEARS OF EXPERIENCE ON BUILDING POWER STATIONS AT DIFFERENT PARTS OF INDIA. DURING ERECTION AND COMMISSIONING OF POWER STATION IT WAS FELT THAT CONSTRUCTION SUPERVISORS AND ENGINEERS KNOWLEDGE ABOUT A POWER STATION IS VERY LIMITED TO HIS OWN FIELD. CONSTRUCTION FIELD IS UNORGANISED IN INDIA. IT FELT PRUDENT TO GIVE THEM KNOWLEDGE OF ENTIRE POWERSTATION IN BRIEF SO THAT THEY CAN UNDERSTAND THE LINK OF THEIR WORK TO SYSTEM. ALSO NEW ENTRANTS WILL BE EQUIPPED WITH GOOD TECHNICAL KNOWLEDGE.
View my complete profile
Powered by Blogger.